Cubby House Project – 06 Frame Assembly

Your ads will be inserted here by

Easy Ads.

Please go to the plugin admin page to set up your ad code.

30 December 2014

Finally some progress as the frames go up.  Hard for the kids to conceptualise all this work until this point.

IMG_3747.JPG

IMG_3751.JPG

IMG_3752.JPG

Dwarfs the old plastic cubby sitting in the back yard.

IMG_3754.JPG

We had made fairly good progress, it had just turned noon and we decided to start work on the roof structure.  After our prototype truss which was to only be at the front and back of the cubby, I decided it would be far easier to just fabricate four of these than what I had originally intended.

Your ads will be inserted here by

Easy Ads.

Please go to the plugin admin page to set up your ad code.

IMG_3755.JPG

IMG_3757.JPG

IMG_3766.JPG

IMG_3762.JPG

Construction time for 30 December, which included levelling the last four posts, fitting the floor to the posts, constructing the front wall frame, mounting all wall frames, fabricating and fitting the roof trusses, ~ 5 hours.