Finally some progress as the frames go up.  Hard for the kids to conceptualise all this work until this point.

IMG_3747.JPG

IMG_3751.JPG

IMG_3752.JPG

Dwarfs the old plastic cubby sitting in the back yard.

IMG_3754.JPG

We had made fairly good progress, it had just turned noon and we decided to start work on the roof structure.  After our prototype truss which was to only be at the front and back of the cubby, I decided it would be far easier to just fabricate four of these than what I had originally intended.

IMG_3755.JPG

IMG_3757.JPG

IMG_3766.JPG

IMG_3762.JPG

Construction time for 30 December, which included levelling the last four posts, fitting the floor to the posts, constructing the front wall frame, mounting all wall frames, fabricating and fitting the roof trusses, ~ 5 hours.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>